DRC-018 is a smart grid IoT device designed to modernize Schneider Sectionalizer (RL Series) that is utilized in medium voltage distribution networks (22kV & 35kV). This robust solution transforms the manual operated Sectionalizer to fully digital operation. With our proprietary management system, PLUM or the RPM Grid, utilities can streamline operation, reduce outage duration, leading to make their grid network more resilient and reliable.
The sectionalizer is a device used in overhead distribution networks to isolate only the faulty section of the line, preventing large-area blackouts.
The DRC-018 integrates with an automatic sectionalizer by providing full remote Trip and Close control, real-time status monitoring, and intelligent event logging.
The DRC-018 changes how Sectionalizers are managed. It no longer requires multiple teams of operators to travel long distances to go on-site to control the Sectionalizer switchgears. They do not need to regularly check the status of the Sectionalizer, record data, or spend long hours managing power disruptions anymore.
With the DRC-018, operators have the choice to manage the Sectionalizer seamlessly through the SCADA system, RPM Grid, a mobile system, the PLUM app, or through call control function. They can monitor, control, and receive alarm notifications anytime and anywhere, right from the palm of their hands.
These possibilities not only reduce operational costs; they also prevent dangers for the operators and make grid management more resilient and reliable.
RPM Grid (Remote Medium Voltage Grid) is a sophisticated system developed by Cambodian engineers to conveniently manage and control the entire distribution grid network. It delivers transformative benefits for utilities by enabling them to monitor, track, and control the grid efficiently—streamlining operations, reducing costs, and increasing overall efficiency.
PLUM (Power Line Utility Management) is a mobile ecosystem application designed to manage the power grid conveniently and efficiently with a smart phone.. With PLUM, the entire status of electrical grid networks is in the palm of your hand. Utilities can monitor and control remotely, receive instant alarm notifications, and access real-time data for fast decision-making—anywhere and at any time.
The DRC-018 changes how Sectionalizers are managed. It no longer requires multiple teams of operators to travel long distances to go on-site to control the Sectionalizer switchgears. They do not need to regularly check the status of the Sectionalizer, record data, or spend long hours managing power disruptions anymore.
With the DRC-018, operators have the choice to manage the Sectionalizer seamlessly through the SCADA system, RPM Grid, a mobile system, the PLUM app, or through call control function. They can monitor, control, and receive alarm notifications anytime and anywhere, right from the palm of their hands.
These possibilities not only reduce operational costs; they also prevent dangers for the operators and make grid management more resilient and reliable.
RPM Grid (Remote Medium Voltage Grid) is a sophisticated system developed by Cambodian engineers to conveniently manage and control the entire distribution grid network. It delivers transformative benefits for utilities by enabling them to monitor, track, and control the grid efficiently—streamlining operations, reducing costs, and increasing overall efficiency.
PLUM (Power Line Utility Management) is a mobile ecosystem application designed to manage the power grid conveniently and efficiently with a smart phone.. With PLUM, the entire status of electrical grid networks is in the palm of your hand. Utilities can monitor and control remotely, receive instant alarm notifications, and access real-time data for fast decision-making—anywhere and at any time.
Take a look at the DRC-018 with the length of 122mm, height of 88mm, and width of 35mm.
The DRC-018 provides a remote control function that is fast, safe, and efficient in daily network operation.
The DRC-018 instantly detects faults and sends the fault information to the utilities’ smartphone using the PLUM App or the RPM Grid system.
The DRC-018 detects every problem occurring inside the Sectionalizer, allowing operators to immediately monitor the condition and health of the equipment.
Utilities can check the sectionalizer's switchgear status (whether it is On or Off) using our intuitive PLUM mobile application or the RPM Grid System.
This outstanding feature saved various reports for analysis and allowed the operators to create a prompt decision making to improve the network management.
Operators can easily identify its location when faults occur, enabling fast fault management and ensuring reliable grid management.
In the event of a fault, the DRC-018 immediately detects abnormal conditions, identifies the fault location, and sends real-time alerts to operators through VP.Start’s control systems — PLUM or RPM Grid. This enables a quick response to isolate the faulty section and restore power to consumers, minimizing outage time.
Digitizing the existing Sectionalizer is no longer time-consuming right now. Utilities do not need to replace their in-use electrical equipment), they can simply integrate our DRC-018, and the whole system becomes digital instantly. The installation is fast, taking approximately 40 minutes, which makes it a very cost-effective solution for utilities - not only require minimal time for modernization, but also reduce capital investment while delivering transformative benefits.
At VP.Start, we prioritized the user experience, ensuring that managing our solution is not only effective but also user-friendly. We make utilities feel comfortable and confident in their operations.
The management of Sectionalizer with the DRC-018 can be done in three simple ways: using our RPM Grid System, using our PLUM app on your smartphone, and simply making a call to control or monitor the status of your distribution grid networks. That’s so convenient for utilities.
The innovative idea of VP.Start is to create a solution that makes an impact for utilities. Adopting the DRC-018 for the Sectionalizer delivers 150% to 200% return on investment by significantly reducing operational expenses and minimizing losses.
This modernization is fast and requires no replacement of existing Sectionalizers—saving substantially on investment costs for utilities.
Remote Control for Entec Auto Recloser
Remote Monitoring for LV/MV Meter
Remote Control for Load Break Switch (LBS)